Breath Cleaner Air call your HVAC Specialist now for a free quote

NSW: 02 4774 1966
QLD: 07 3889 5621

Our Recent Projects


DAME PATTIE MENZIES HOUSE, Canberra ACT

At Dame Pattie Menzies House AM Coil‘s comprehensive project included the following:

  • All the cleaning was done in accordance with A.S.1851.6 and normal practises for the maintaining of Indoor Air Quality in buildings.
  • The building’s air conditioning systems were accessed by way of the installation of access doors.
  • The building’s air conditioning systems were cleaned by way of contact vacuuming, air washing, and agitated air brush and air whip systems.
  • Repairs to the building’s air conditioning system’s internal acoustic linings was by way of the application of “Tough Coat” A mechanical insulation repair and microbial coating.
  • The buildings entire air conditioning systems were also decontaminated using a high grade air conditioning disinfectant.
  • A compressive report was issued on completion of the project highlighting the cleaning, repair and decontamination process and any further recommendations. Accompanying this report was a guarantee of workman ship and procedures carried out through the project.

TOWNSVILLE CIVIC THEATRE, Townsville, QLD

At Townsville Civic Theatre AM Coil conducted a thorough clean of:

  • General Ventilation ducts
  • Air Conditioning ducts
  • Split Wall Hung Units
  • Associated Plant

We found that as would be expected the build up of foreign matter was consistent with the operations of an establishment some 30 years old and of this size and nature of business.

All the cleaning was done in accordance with A.S.1851.6 and normal practises for the maintaining of Indoor Air Quality in buildings. The work was carried out between the hours of 7am and 4.30pm to cause as little interference as possible with the normal operations of the Theatre.